spacer spacer
Home arrow FAQ's arrow 23. How much does the Blue Tower cost?
23. How much does the Blue Tower cost?
Again this can only be answered on a case by case basis. This hugely depends on multiple factors which can considerably affect the price. These factors include: input material – what type of pre sorting, drying & other treatment must be executed, is the input material highly corrosive, toxic, etc. what are the climate conditions (temperature, wind, earthquakes, salt level of the air, soil conditions, etc.), environmental regulations (for example: noise, odor and carbon emissions), goals of the system i.e. does the operator additionally wish to produce hot or cold water, generate further energy from the process heat, etc. what type of storage facilities are needed, what type of building and foundation is required. These are just a few factors which determine the price. However, a simple 15 MW unit handling approximately 30,000 tons of sorted and dried waste can cost around 20 million euros.
 

News

FMM in India
Together with our partners Concord Blue we are building a 8MW Blue Tower Waste to Energy plant expected to commence operating in March 09!
 
FMM in India - 15MW MSW in Mumbai

The Blue Tower has qualified for the tender process for a 15MW municipal solid waste to energy plant in Mumbai.

 

news Archive

News archive
Read more news...
©2009 Blue Tower Energy -
All Rights Reserved