spacer spacer
Home arrow FAQ's arrow 2. What Input Material does the Blue Tower run on?
2. What Input Material does the Blue Tower run on?
The Blue Tower can uniquely run on a multi-feedstock input material. Before the material goes into the Blue Tower we can automatically segregate out all inert materials such as glass, rocks & stone and metals. Virtually any other material with an organic base can be used. This includes the following:

  • Any woody biomass (green cut, foliage, hay/straw, forest biomass or roadside collection, residual wood even with burden of contaminants)
  • Sewage sludge
  • Hospital Waste
  • Municipal Solid Waste/Bio-garbage/ Restaurant-food waste
  • Animal manure, other animal wastes
  • Any agricultural biomass waste – e.g. sugar cane & distillery effluents,  (including “energy plant” residuals)
  • Manufacturing sludge (e.g. paper, paint)
  • Paper recycling refuses
  • Plastic waste
  • Any waste with a significant organic component
 

News

FMM in India
Together with our partners Concord Blue we are building a 8MW Blue Tower Waste to Energy plant expected to commence operating in March 09!
 
FMM in India - 15MW MSW in Mumbai

The Blue Tower has qualified for the tender process for a 15MW municipal solid waste to energy plant in Mumbai.

 

news Archive

News archive
Read more news...
©2009 Blue Tower Energy -
All Rights Reserved